A company announces that its deposit contains ten million ounces of gold. Does that mean ten million ounces it can mine and sell? Not necessarily.


The main point: a Mineral Resource is material with reasonable prospects of economic extraction. A Mineral Reserve is the part shown to be economically mineable after detailed study. Knowing the difference is the first step in reading any mining company's numbers.


Why reporting codes exist

Mining companies report estimates of something nobody can fully see. Reporting codes give those estimates shared definitions and minimum standards.


The CRIRSCO International Reporting Template sets out a common international framework. In South Africa, the SAMREC Code sets minimum standards for public reporting. The 2016 edition remains mandatory, and SAMCODES reports that an update is being prepared. Exact wording and requirements can differ between codes, so check the code a company reports under.


Mineral Resources: three levels of confidence

A Resource is grouped by how much confidence the geological evidence supports. The template's definitions run from lowest confidence to highest:


  • Inferred. Based on limited evidence and sampling, which is enough to infer continuity but not demonstrate it. SAMREC 2016 still says "imply but not verify".

  • Indicated. Known well enough to apply mining and economic assumptions for mine planning and evaluating viability.

  • Measured. Known well enough to support detailed mine planning, with the highest confidence of the three.


One rule matters more than most: Inferred Resources must not be converted to Reserves. Further exploration may upgrade them, but that has to happen first.


Mineral Reserves: what the studies support

A Reserve is the economically mineable part of a Measured or Indicated Resource. Getting there takes at least a pre-feasibility-level study, or a Life of Mine Plan at that level for an operating mine, applying what the codes call Modifying Factors.


These cover much more than geology:


  • Mining, processing and metallurgy

  • Infrastructure, economics and marketing

  • Legal, environmental, social, governance and regulatory considerations


Reserves come in two categories. A Probable Reserve usually comes from an Indicated Resource, while a Proved Reserve comes from a Measured Resource and implies high confidence in the Modifying Factors.


Reserve figures also allow for dilution and mining losses. A Reserve tonnage is therefore not simply a slice of the Resource tonnage, and its grade can differ.


Diagram of Mineral Resources beside Mineral Reserves. Measured leads to Proved and can lead to Probable, Indicated leads to Probable, and Inferred must not convert to a Reserve.
Figure 1. How a Mineral Resource can become a Mineral Reserve. Simplified from the CRIRSCO definitions.

A fictional example

Suppose a fictional company reports 20 million tonnes (Mt) of Measured, 60 Mt of Indicated and 100 Mt of Inferred Resources. Its total of 180 Mt sounds impressive, but only 80 Mt can feed a Reserve as things stand.


A study might then show that part of that 80 Mt is too costly to mine, or sits under land the project cannot access. The Reserve could end up well below the headline figure, and that would not mean anyone did anything wrong. The two numbers answer different questions.


Who stands behind the numbers

Public estimates must be based on work by a Competent Person. Under the template, this is a minerals industry professional who belongs to a recognised body with enforceable disciplinary processes.


That person also needs at least five years of relevant experience in the type of deposit and the activity involved. The name matters because one or more named professionals sign off on the work, while the company's board remains responsible for the report.


Five questions to ask

When you next read a resource statement, try these:


  • Which category is it? A headline may combine Inferred, Indicated and Measured material.

  • How much is Inferred? A large share means more of the estimate rests on limited evidence.

  • Are Resources inclusive of Reserves? Reports must say which basis they use. Either way, the codes say not to add the two figures.

  • What level of study supports the Reserve? Check how far the work has gone.

  • What assumptions sit behind it? Metal prices, cut-off grades and permits can all change the answer.


A Resource figure is not a forecast of what a mine will produce. A resource statement is a dated, qualified estimate, and its value lies in being clear about what is known and what is not.


This briefing is a general introduction to reporting concepts. It is not investment, legal or technical advice, and requirements differ between codes and exchanges.